We supplied 99 bedrooms and 8 kitchens as part of a refurbishment project to Crossways House.
“It was a pleasure to work with Ellis on Crossways House. They were very proactive throughout the build and it was a collaborative experience. They have worked in the business for many years and their experience was invaluable to us. We are delighted with the finished product as were the students when they moved in!”
Focus Plus was selected as the bedroom furniture for its durability and variety of storage design options.
Contract Heavy Duty kitchens were chosen for its renowned durability in damp, high use environments.
We've given our Contract HEavy Duty range a 10-year guarantee.
The 134 en-suite, self-contained studio bedrooms, were designed to maximise space and be a stylish haven for students to retreat.